User name
Password

Don't have a user name yet?
Register here.

Help

The Soca River Hydroelectric Power Plants Opened

Nova Gorica, 24 April - Two newly constructed hydro power-plants on the Soca river (West Slovenia), Doblar II and Plave II, were opened on Thursday by President Janez Drnovsek. Electrical generator sets of both power plants will have a joint capacity of 60MW, which means an encreased maximum production by 106 GWh per year, or 75 percent of added power and 35 percent of added energy. The investment value of the equipment stood at EUR 105m.

The rest of this news item is available to subscribers.
The news item consists of 698 characters (without spaces) or 127 words words.

Buy the news item. Price: 2 tokens; on account: 0 tokens.

ar/nn/as
© STA, 2003