User name
Password

Don't have a user name yet?
Register here.

Help

Referendum on Hydro-Power Plant Expansion Looming at Bled

Bled, 20 July - The locals of the lakeside town of Bled are expected to go to a referendum in autumn to decide whether to allow the construction of a hydro-electric plant reservoir that would flood a river basin that was declared natural monument by the municipality back in 1998.

The rest of this news item is available to subscribers.
The news item consists of 1.018 characters (without spaces) or 209 words words.

Buy the news item. Price: 2 tokens; on account: 0 tokens.

vh/tzu/bdo/ep
© STA, 2004