TEŠ 6 shut down for repairs, to be reconnected soon
Šoštanj, 15 March - The main unit of the Šoštanj coal-powered thermal power plant (TEŠ) had to be shut down on Saturday for repair work due to leakage detected in the boiler evaporator. Unit 6 is expected to be reconnected to the grid today.
The rest of this news item is available to subscribers.
The news item consists of 511 characters (without spaces) or 106 words words.
Buy the news item. Price: 2 tokens; on account: 0 tokens.