TEŠ 6 shut down for repairs, to be reconnected soon
Šoštanj, 15 March - The main unit of the Šoštanj coal-powered thermal power plant (TEŠ) had to be shut down on Saturday for repair work due to leakage detected in the boiler evaporator. Unit 6 is expected to be reconnected to the grid today.
Šoštanj
The Šoštanj thermal power plant.
Photo: Daniel Novakovič/STA
The rest of this news item is available to subscribers.
The news item consists of 511 characters (without spaces) or 106 words words.
Buy the news item. Price: 2 tokens; on account: 0 tokens.