Karavanke Tunnel work on Slovenian side on schedule
Jesenice, 9 March - Work on the second tube of the Karavanke Tunnel on the border with Austria is on schedule. Turkish Cengiz workers have already bored some 550 metres of what is a roughly 3.5-km tube on the Slovenian side. No major problems have been encountered since boring started last August and is expected to be completed in two years.
The rest of this news item is available to subscribers.
The news item consists of 1.613 characters (without spaces) or 317 words words.
Buy the news item. Price: 2 tokens; on account: 0 tokens.